STRUCTURAL WORK COMPLETED IN 8 HOURS – an example of a single family house.
The individual module of the Redbloc prefabricated house is already completed. The house can be delivered and erected within one day. The construction is completed by 1 skilled worker and 2 other workers without problems, there is no need for extraordinary building expertise.
The building time is shortened by 5 weeks due to dry process, because there is no moisture added to the construction of the massive masonry works, no drying phase is required.
An essential time saving factor results from the lack of stem work, the REDBLOC prefabricated house lintels and electrical channels are already integrated.
The sum up these advantages, a REDBLOC pre-fabricated house can be turn-key ready within 4 months, and maintains the constant quality of an automatic process.
THE FOUR STEPS OF A PREFABRICATED HOUSE
09:00 After the setting of the underlying platform on the foundation platform, the REDBLOC prefabricated module is set with the crane onto the prepared mortar bed.
10:00 The wall is set vertically and the side supports are stabilized with a hexagon bolt screwed onto the wall. After adjusting the screw anchor into the fundament, the reusable lifting bars can be removed.
14:00 After completion of the erection the corner areas inside and outside the walls are joined.
16:00 The last step is the construction of the ceiling or roof truss. If more than one story is planned, then this is a between step.